CLIDING

Confidence Before Commitment

Independent evidence verification for commercial solar finance.

Cliding is designed for lenders, asset-finance providers and funders reviewing UK commercial rooftop solar applications.

It brings the technical, financial and project evidence behind each case into one view, showing what is supported, what conflicts and what still needs attention.

Illustrative evidence assessment

Commercial Rooftop Solar320 kWp

  • System design

    Verified

    Submitted design is supported by available project evidence.

  • Annual generation

    Assumption requires review

    Further evidence is needed to support the submitted assumption.

  • Electricity consumption

    Additional information required

    Required consumption evidence is not yet available.

  • Projected savings

    Assumption requires review

    Depends on consumption evidence that is not yet available.

  • Grid connection

    Evidence inconsistent

    Submitted connection assumptions conflict with available evidence.

The problem

Commercial solar cases can be difficult to verify consistently.

Evidence arrives from borrowers, installers, consultants, design tools, energy records and other third parties.

The challenge is not collecting it. It is understanding what supports each claim, what conflicts, what is missing and what needs review before a case progresses.

Cliding is designed to make that review structured and traceable.

What Cliding checks

Evidence is reviewed across three areas:

Technical & Generation

  • System design information
  • Equipment and capacity data
  • Design and generation assumptions
  • Independent generation plausibility checks
  • Supporting technical evidence

Energy & Financial

  • Consumption evidence
  • Self-consumption assumptions
  • Electricity savings
  • Project cash flows
  • Relevant financial metrics, such as DSCR

Financial results carry the uncertainty of the assumptions they depend on.

Project & Connection Evidence

  • Installer and certification evidence
  • Building and energy records
  • Company information
  • Grid and connection evidence
  • Available project and site documentation

Follow the evidence behind one claim

Every evidence state can be traced back to the information behind it.

Illustrative

  1. 01SOURCE

    Submitted project evidence

  2. 02CLAIM

    Annual generation

  3. 03NORMALISE

    Converted to a comparable project measure

  4. 04CHECK

    Checked against independent reference data

  5. 05EVIDENCE STATE

    Assumption requires review

    Basis: Independent reference data

    Further project-specific evidence is needed before this claim can be supported.

How evidence is labelled

  • Verified

    Available evidence supports the claim for the purpose of review.

  • Assumption requires review

    The claim may be plausible, but available evidence does not fully support it.

  • Evidence inconsistent

    Two or more relevant pieces of evidence do not agree.

  • Additional information required

    There is not enough information to complete the check.

Cliding is designed to support the review process. It does not score borrowers or make the lender’s credit decision.

Relevant evidence may come from independent and project-specific sources, including:

  • Public and regulatory records
  • Energy and building information
  • Grid and connection evidence
  • Industry design information
  • Independent generation reference data
  • Borrower, installer and project documentation

Help shape how commercial solar evidence is reviewed.

We are speaking with lenders, underwriters and commercial solar finance professionals to understand where evidence review creates the most friction today.

If you work in commercial solar finance, we’d value a short conversation to understand your current review process.

No sales presentation. Just a focused conversation about how your review process works today.